Home | About You | About CIMx | Products | Services | Contact Us | Log-In | 1-877-FOR-CIMX
 

 

CIMx Customer Success Stories
CIMx

 

Success Story #1  (click here for more details)
Problem
  • Paper-driven shop floor with many errors
  • Too much non-productive “wait time”
  • Too many people needed to support paper
  • Lack of timely shop floor status
  • Little linkage from shop to other systems

  • Solution
  • Installed CIMx Interax

  • Result
  • Reduced manufacturing cycle time by 33%
  • Reduced support for shop floor information by over 80% - people reassigned
  • Saving $5 million annually
  • Shop floor integrated to rest of company
  • Eliminated paper-driven errors
  • Success Story #2  (click here for more details)

    Problem
  • Homegrown work instruction system
  • No standardization of work instructions
  • Lack of buy-in by different plants
  • Little internal support
  • Produtivity was starting to deteriorate
  • Cause of much scrap and rework

  • Solution
  • Installed CIMx Interax

  • Result
  • Saved over $30 million in ten years
  • Reduced non-productive time by over 25%
  • Reduced scrap and re-work by over 20%
  • Standardized systems across ten plants
  • Systems were activelty supported, upgraded, and expanded to new plants
  • Success Story #3  (click here for more details)
    Problem
  • Government customer specified a need for a higher level of quality, because quality failures were jeopardizing the project
  • Need to double production
  • Existing processes could not achieve results
  • Old systems were obsolete
  • Desired a standardization across product lines
  • Desired a state-of-the-art technology solution

  • Solution
  • Installed CIMx Interax

  • Result
  • Paperless operation
  • Plant prodution was doubled with the same personnel
  • Reduced costs by over $2 million anually
  • Qualtity improved and the project was saved
  • Standardization was enabled
  • Success Story #4  (click here for more details)
    Problem
  • New plant goals required paperless operation
  • Quick turn up was required to meet the first production run
  • Integration of work instructions, tooling, maintenance, and quality was desired
  • Customer also required automatic collection of machine data

  • Solution
  • Installed CIMx Interax

  • Result
  • Rapid installation and operation
  • High productivity
  • Accurate, error-free records
  • Cost savings to exceed $1 million annually
  • Machine integration
  •  

    CIMx

     
     
     
    Products: Interax
    CIMx Supports: Manufacturing Execution Systems (MES) | Enterprise Resource Planning Systems (ERP) | Product Lifecycle Management (PLM) | Lean Manufacturing
    Services: ROI | Engineering Assessment | Data Migration | Data Integration
     
     
    Copyright© CIMx 1996-2009 All Rights Reserved