CIMx Software Advantages Print E-mail

Developed by manufacturing engineers and software professionals, CIMx Software's Interax is the lowest cost, lowest risk paperless manufacturing and MES solution that will failure proof your shop floor operations.

 

 

Simple

 

 

Adaptable

 

 

Sustainable

 

 

Strategic

Feature CIMx Advantage Other Vendors

Rapid Installation

 

Installation in 90 days Installation > 1 year
Ease of Use Acceptance by shop floor and IT personnel Require intensive programming changes to simplify use
Configurability1 Continually evolves as processes change Require customers to pay for changes as processes change
Work Flow Events2 Local optimization outside of application Require application changes, making upgrades difficult and costly
Ease of Change Will not become obsolete over time Obsolete within first few years of production
Integration3 Integrate with other systems without customization Use custom code to create a unique integration at each site
ROI Repeatable savings every year Lifecycle costs increase each year as vendor services are required
Ability to Optimize Always matches shop floor needs Creeping obsolescence leading to new system purchase
  1. Configurability is achieved through the Interax System Manager module that allows local optimization to meet unique processes and operations while still maintaining a common enterprise wide solution.
  2. Special work flow based events and triggers are added outside of the application to maintain a solution that is easy to upgrade and optimize.
  3. Integration is facilitated by the Interax Integration Engine module that quickly creates XML paths or trigger sequences to another system to pass or acquire data.

Minimum Risk, Maximum ROI

CIMx Software lowers the life cycle cost and risk to its customers by:

  • Using standard configuration tools to deliver functionality quickly
  • Using a software delivery process that allows our customers to install every new upgrade without additional support costs or vendor services
  • Providing services that require a minimal amount of CIMx billable time
  • Complete system training in less than one week
    • 3 days for system administrators
    • 1.5 days for planners
    • 0.5 days for shop floor personnel

CIMx has a reputation for project delivery that is on-time and on-budget. In over 15 years, CIMx has delivered every customer project on-time. CIMx has never returned to a customer to seek additional funding for work that was quoted or had to request additional funds to finish a project. That's a 100% guarantee from us to you.