Solution: The Company installed Interax to solve the problem. They use it for work instruction generation, tool and asset management, creating and managing quality control plans and for web-enabled access and viewing of shop floor operations.
Result: They achieved a manufacturing cycle time reduction of 33%, over 80% reduction in support needed for information flow to and from the shop floor and a major reduction in tooling inventory needed. The annual savings exceed $5 million for this single location. The solution was then deployed to other locations in the company where similar benefits are being produced.
Benefits: