how to buy an MES: step one - discovery
Your discovery process–the questions you ask yourself to determine what you need–should start with a more important question: why do you need a...
5 min read
Kristin McLane
:
October 21, 2026 at 10:00 AM
I was reaching for my deodorant yesterday when I realized that it assured me “72 hours of protection”. Back in the day, I used to love camping and, if you could reach me by cell phone, I had not gone far enough into the wilderness. This was not car camping or a site at a campground with a shower and toilet. This was carry-your-own-water, backpack in and pitch a tent. For that, 72 hours of protection would have been fantastic. Now, with a desk job, I wouldn’t want to even see me after 3 days with no shower.
So what’s the point of giving me more than I need? The upside of my deodorant is that the 72-hour stick is no more expensive than the regular and it takes no more brain power to operate. My experience with it is the same. I don’t spend time at the store (but apparently, I do spend time thinking and writing about it here) wondering if I need it or if I should purchase it.
It’s totally different when you’re buying tools to help you in your shop. For that, you don’t need more than you need (which is a hard bar to assess) and you don’t want to pay more than you must. Unlike my anti-smell stick, manufacturing software systems vary greatly in price and – often – that one with the custom set of features you need is priced exactly the way you think it would be (completely unaffordable).
how much is too much in production operations?
First, let’s talk about cost. The average reported profit margin in US manufacturing last year was 5 – 10% (and there’s a healthy difference there between 5 and 10). That’s not as thin as some margins for small manufacturers that we talk to, but we’ll use those numbers in our calculations here. The average hourly wage was between $30 – 32, reported in June of this year. For every 15 minutes that you’re able to save the average worker each day, you’d be safe to say the reported cost savings would be about $8, not loaded.
Further, history has told us that you should spend between 2 -3 % or less than 5 % of your total net revenue on software in manufacturing. That means, for every million dollars that you are selling, you have:
Not all of you want to spend all that savings on software; we certainly don’t want you to. That’s the overspend trap that we see so many manufacturers get tangled up in. They purchase software systems with annual spends in the 50,000 – 100,000 range annually and cannot sustain that and do not get the return they need. Note that services dollars scale with the price of the system, so everything will be more expensive.
Once you get past cost, you’ll want to consider time. It takes me no more time to swipe on a regular stick as a 72-hour one. Not so in production control software. And it’s very much related to the time you’re going to spend (and save) as well. I’m far more likely to pay attention to a medical procedure to avoid deodorant all together than I am each morning as I open the cap. You are more likely to spend a lot more time and attention on a system that costs upwards of 2 full-time staff every year. That’s time and money you can’t spend elsewhere and – unless it is providing you monumental gains over other systems – it’s not money or time you can afford, literally.
Time for these systems comes in three forms: before, during and after implementation. The before is what you’re living now and only you know where your pain points are and how badly you want to get rid of them. That 15 minutes of cost savings per employee per day that we talked about can add up quickly if it’s real for your team. You will want to be very careful that you’re not overspending time in other areas, however, and that’s where we move into the “during” phase. Software is one of those “the more you put into it, the more you’ll get out of it” products, but don’t let that swallow you up. You need to know that the software vendor has done their due diligence to limit the amount of set up time you need to spend to get the thing to work. Here, we’re going to talk about MES systems only or the manufacturing area of an ERP / MRP.
Sidenote here: in 30 years, we have never met, worked with or even talked to a manufacturer that put in an ERP system of any kind that got to implement it on the shop floor until all the financial areas were complete. For most of them, that timeline lengthened with every project, was longer than they were expecting, and put manufacturing behind by a good 6 months – 2 years. Which one of you can predict that you’ll need help in manufacturing but not for another 2 years or are willing to wait for that time once you put the system in? The global economy is moving too quickly for that to be competitive for you.
where are the time savings in Production Control?
For any system that will work on your shop floor or with your operators, you will want to be sure you have a few key ingredients; everything else can be beneficial but worth far less without these.
Phew! After all that, we may NEED 72-hour protection. Next week, we’ll talk more about what you should expect to invest in and what’s a smart use of your time.
You might also like: The Best Manufacturing Software Systems for Aerospace Manufacturers in 2026
1 min read
Your discovery process–the questions you ask yourself to determine what you need–should start with a more important question: why do you need a...
For many small and midsize manufacturers, the shop floor is where the business either stays in control or starts losing visibility. Jobs move from...